How long does it take to install a snap-in connector?
Under 60 seconds per end, tool-free. Once the spigots are welded in place, replacing a worn sleeve is a pull-off / snap-on operation that production staff can do during a line stop.
Under 60 seconds per end, tool-free. Once the spigots are welded in place, replacing a worn sleeve is a pull-off / snap-on operation that production staff can do during a line stop.